We built castles, and saw baby animal, including a baby flamingo.
The baby is the gray flamingo sitting on the ground. I was expecting a much smaller bird than the rather larger one we saw. It was still a cute little thing covered in downy feathers.
In the evenings, I still managed to sneak in a bit of knitting. In fact, I had enough knitting time to finish the front of Anniversary Sweater 2.0.
The sweater is much faster to knit the second time around. With luck and good knitting karma, I'll be able to present the sweater to Italian by the end of the month. Since I've
1 comment:
Sounds like a fun time, with no deadlines to meet
Post a Comment